Liao River Water Conservancy Project
Case Study: Geosynthetics in the South-to-North Water Diversion Project 1. Project Challenge: The Seepage Imperative The South-to-North Water Diversion Project, a critical infrastructure to alleviate water scarcity in northern China, required moving vast quantities of water over immense distances. A primary engineering challenge was minimizing water loss through seepage, especially
Read MoreAnti-Seepage Project for Shenyang Landfill
Case Study: Application of Geomembranes and Geotextiles in the Construction of a Landfill Site – Taking Shenyang City Landfill as an ExampleProject BackgroundWith the accelerated urbanization and population growth in Shenyang City, the volume of municipal solid waste increased dramatically. The capacity of the existing Laohuchong Landfill was nearly exhausted.
Read MoreDaya River Reservoir Anti-Seepage Project
Daya River Reservoir Anti-Seepage ProjectCase Study on the Application of Geosynthetic MaterialsProject OverviewItemDetailsProject NameDaya River Reservoir Anti-Seepage ProjectLocationJunction of Balidianzi Town and Pulebao Town, Huanren Manchu Autonomous County, Benxi City, Liaoning ProvinceDeveloperState Grid Corporation of China, Northeast Development and Construction Branch of State Grid Xinyuan Holding Co., Ltd.Total InvestmentRMB 10.958
Read More